It has found reasonable ways brought roadbed to resultant stabilization owning to synthesize many factors such as earthiness,hydroclimate,wheather etc to find self weight and external load of roadbed.
本文结大齐公路施工实例,论述
的通车碾压工后沉降期及相应制约因素,综
土质水文、
候天
等制约因素,以寻找路基自重外荷载作用,使路基达
稳定的
途径。