It has found reasonable ways brought roadbed to resultant stabilization owning to synthesize many factors such as earthiness,hydroclimate,wheather etc to find self weight and external load of roadbed.
本文结合大齐公路例,论述了合理的通车碾压
后沉降期及相应
约因素,综合了土质水文、气候天气等
约因素,
路基自重外荷载作用,使路基达到最终稳定的合理途径。