According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对WZ-C料钟顶装料设备存在的布料器温度、透水等问题进行了原因分,并进行水冷、水封系统改进。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对WZ-C料钟顶装料设备存在的布料器温度、透水等问题进行了原因分,并进行水冷、水封系统改进。
The maximum depth of the pit is mainly related to the inflow angle, unit discharge and the perviousness of the dike etc. with the maximum impact from the Unit discharge.
透水桩坝的坝前最大冲刷坑深度主要与宽量、入角、桩坝透水率等因素有关,其中宽量对冲刷坑深度的影响最大。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。